Sector · End-of-life tyres

Fire detection for tyre recycling sites

Tyre recycling and tyre storage sites need fire detection that raises the alarm day and night, because tyre fires are hard to put out once they take hold and many start after the site has closed. EA guidance lists CCTV visual flame detection among suitable systems. Woodcock AI adds smoke and fire detection to the CCTV you already have.

Night CCTV of a tyre yard: teal zones round three separate rows of whole tyres, smoke boxed in amber above the middle rowTyre yard, after closing

Last updated 30 October 2026. End-of-life tyres are one of the hardest combustible wastes to deal with once they catch fire. They burn hot, give off thick black smoke and oily run-off, and can smoulder for days. This page explains what the Environment Agency (EA) and the Health and Safety Executive (HSE) ask of tyre recycling yards, tyre storage depots and shredding sites, what is changing for the T8 waste exemption in 2027, and how camera smoke and fire detection fits into your fire prevention plan (FPP).

Why do tyre recycling sites catch fire?

Most tyre site fires start in one of a handful of ways, and your FPP needs a control for each. The EA’s fire prevention plans guidance lists the common causes of fire on waste sites, and the HSE’s guidance on spontaneous heating of piled tyre shred and rubber crumb adds the risks that are specific to processed rubber:

  • Arson and vandalism. Whole tyres are easy to light and hard to put out. Yards that are fenced but empty at night need security that keeps working when the gate is locked.
  • Hot works. Grinding, cutting and welding on plant or steel need a permit to work and a fire watch afterwards.
  • The shredder and other plant. Friction, worn parts and hot surfaces on shredders, conveyors and loading shovels are a common source of heat, and rubber dust and fibre collect around them.
  • Self-heating. Tyre shred and crumb are porous and have a large surface area, so piles of them can heat up on their own. The HSE notes that rusting exposed wire and contamination add to the risk.
  • Nearby heat sources. The HSE asks operators to keep heat sources away from piles and to consider shading or enclosing them.
Where tyre site fires startTyres, shredand crumbArsonclosed yard, open fenceHot worksgrinding, weldingShredderhot surfaces, frictionSelf-heatingdeep shred and crumbHeat sourcestoo close to the pilesYour FPP needs a control for each routeFive ignition routes
Each needs its own control in the plan, not just an alarm.

Several of these routes share one thing: the fire starts when nobody is watching. That is why the detection section of a tyre site FPP has to cover the hours when the site is closed as well as working hours. Our waste site fire risk assessment guide walks through how to assess each area of a site.

Why are tyre fires so hard to put out?

A burning pile of tyres is very different from a burning pile of paper or wood. The HSE says that once a fire in tyre shred or crumb is established, applying water or foam in situ is generally ineffective and can make things worse by creating oily run-off. Its advice is that the first priority is to separate unburned material from the fire, and it warns that people nearby can be exposed to smoke containing polycyclic aromatic hydrocarbons and sulphur oxides.

That has two consequences for your plan. First, the fire needs to be found while it is still small enough to pull unburnt tyres away from it. Second, you need the space, plant and people to do that, at any hour. A fire that is only noticed when the smoke plume is visible from the road has usually gone past that point.

Fire and rescue services know how long these incidents can last. In August 2022 Nottinghamshire Fire and Rescue Service reported a fire at an industrial site in Ranskill where thousands of tyres were alight, producing a large plume of black smoke. Crews were called at 10.23am, there were 14 fire engines at the scene by late afternoon, and five days later crews were still there creating fire breaks. Incidents like this are why regulators put so much weight on keeping piles small, keeping them apart and finding fires early.

What are the EA rules for storing tyres?

If your permit requires a fire prevention plan, the EA guidance sets out the standard measures. It treats tyres and rubber as one waste type, covering whole tyres, baled tyres, and tyre shred, crumb and fibre. Its general principle is that waste should be stored in its largest form, because whole tyres are less prone to self-heating than shred or crumb.

Standard maximum pile volume for tyres and rubber

Whole tyres, loose: 450 cubic metres

Loose whole tyres, the largest form, which the guidance asks you to keep waste in where you can. Every pile no higher than 4 metres, no longer or wider than 20 metres, and at least 6 metres from other piles, the boundary and buildings.

Baled tyres or 30 to 150mm: 300 cubic metres

Tyre bales and coarse shred or chip. Every pile no higher than 4 metres, no longer or wider than 20 metres, and at least 6 metres from other piles, the boundary and buildings.

Crumb and fines under 30mm: 300 cubic metres

Fine crumb, granulate and fibre, the forms HSE says are most prone to self-heating. Every pile no higher than 4 metres, no longer or wider than 20 metres, and at least 6 metres from other piles, the boundary and buildings.

From the EA fire prevention plan guidance, sections 9.2 and 11. Your own permit may set different limits.

On top of the pile sizes, the guidance sets a maximum height of 4 metres and a maximum length or width of 20 metres for all piles, and a separation distance of at least 6 metres between piles and from the site boundary, buildings and other combustible materials. It notes that waste with a higher calorific value, which includes tyres, may need greater separation distances or fire walls. Fire walls must give at least 120 minutes of fire resistance and stand at least 1 metre higher than the waste beside them.

Standard pile limits, seen from aboveSite boundaryPile 1max 4m highPile 2max 4m highup to 20m long or wide6m or more6m6mEA FPP guidance, sections 9 and 11. Higher-calorific waste such as tyres may need more space or a fire wallPlan view
A pile of 20 metres by 20 metres at most, kept 6 metres from its neighbours and from the fence.

The guidance also says waste should not be stored for more than 6 months, that it should be rotated on a first in, first out basis, and that piles kept at the maximum size for more than 3 months need extra measures such as temperature monitoring. If you store waste in a building, you must have a suppression system as well as detection.

Daytime CCTV view of a tyre yard with two blocks of tyre bales and a pile of loose tyres, each outlined by a teal zoneYard by day
Bales stacked in two blocks with a clear gap, and loose casings kept apart, each watched as a separate detection area.

Many smaller tyre sites in England operate under the SR2021 No 13 standard rules for storing and mechanically treating end-of-life tyres for recovery. These allow up to 5,000 tonnes of tyres a year, with no more than 100 tonnes on site at any time and nothing kept for longer than 3 months. Treatment has to happen indoors, apart from manual sorting of casings, though tyres may be stored outside. The rules require all waste to be kept secure so that members of the public cannot get to it, and they require you to take all appropriate measures to prevent fires, with a fire prevention plan if the EA tells you your site is a fire risk.

Is the T8 exemption for tyres ending?

Yes, in England. The T8 exemption for mechanically treating end-of-life tyres currently lets you bale, shred or cut tyres on a smaller scale without a permit: up to 60 tonnes of truck tyres or 40 tonnes of other tyres over any 7 days, kept in piles of no more than 10 tonnes with a gap between them as a fire break. In its policy paper Reforming the waste exemptions system (15 July 2025), Defra said that given the fire risk from storing tyres, and evidence that exemption limits are being exceeded by significant amounts, it had decided to remove the T8 exemption.

GOV.UK’s page on waste exemptions: new rules from January 2027 (updated 21 October 2026) sets out the timetable. The reforms are expected to be approved before 17 December 2026 and come into force from 6 January 2027, and T8 will be withdrawn on 6 April 2027. If you need to keep treating tyres after that, you will need an environmental permit, and GOV.UK says you should apply before T8 ends. You can carry on operating while the application is being processed.

T8 to environmental permit, EnglandNowT8 exemptionpiles of 10 tonnes or lessBefore 17 Dec 2026reforms expected to be approved6 Jan 2027new exemption rules start6 Apr 2027T8 withdrawnpermit neededAll dates are subject to Parliament. Apply for your permit before T8 ends;GOV.UK says you can keep operating while the application is processedFrom exemption to permit
The dates GOV.UK has published for England, all subject to Parliament.

Defra’s paper also makes clear that tyre fitters and garages storing their own waste tyres before collection are not affected; they are covered by separate storage arrangements. For operators moving from T8 to a permit, the fire prevention plan is usually the biggest piece of new work, and detection is one of the sections the EA looks at most closely. Our fire prevention plan checklist lists everything a plan needs.

How does tyre shred and crumb self-heat?

The HSE explains that experience suggests auto-ignition normally happens in stockpiles more than 3 metres deep, and that finer shred is more susceptible. Piles deeper than about 1 metre can still heat up and ignite over long periods, measured in weeks. Because the heat builds inside the pile, the signs at the surface are subtle: a slight sulphurous smell, a haze of condensation coming from vents in the pile, or oil in the drainage water. The HSE adds that a smouldering fire can turn into a flaming one when it reaches the surface or when the pile is disturbed, for example when a loading shovel starts to dig into it.

What a heating shred pile showsHeat deep insideProbeFaint smoke or vapourOily run-offHSE: auto-ignition is normally seen in piles more than 3m deepInside the pile
Heat builds out of sight, while the clues reach the surface late and faintly.

The HSE’s list of controls is practical: remove fines and metal, limit pile size, manage moisture, rotate stock, monitor temperature below the surface, turn piles that are heating, provide shading or enclosure, and keep heat sources away. None of these is a camera job, and a camera cannot see heat building deep inside a pile. What a camera can do is watch the surface of every pile and the shredder area, all the time, for the smoke and flame that appear when heating breaks through.

Night CCTV inside a tyre shredding building: a teal zone round the shredder and another round the pile of rubber shredShredder hall at night
The machine and the output heap drawn as two separate areas, so an alert names the one where smoke appears.

What fire detection does a tyre site need?

Section 13 of the EA guidance says you must have procedures to detect a fire in its early stages, and your plan must show how the detection system raises the alarm both during working hours and when the site is closed. It must be proportionate to your activities and risks, and it can be automated or manual. The examples of appropriate automated systems are smoke and heat detectors including temperature probes, CCTV visual flame detection systems, and spark, infrared and ultraviolet detection. Design, installation and maintenance must be covered by an appropriate third-party certification scheme such as UKAS or meet a recognised standard, such as a British Standard; if neither applies, you must show you can still meet the three objectives of the plan. Our guide to EA fire prevention plan detection requirements covers this section in full.

Those three objectives are to minimise the likelihood of a fire, to aim for any fire to be extinguished within 4 hours, and to minimise the spread of fire within the site and to neighbouring sites. For tyres, which are hard to extinguish, the second and third objectives depend heavily on how early the fire is found.

For a tyre site, no single method covers everything, because the risks show up in different places:

  • Heat inside shred and crumb piles builds slowly and out of sight, so the HSE recommends sub-surface temperature monitoring, and the EA lists it among the extra measures for piles kept at maximum size for more than 3 months.
  • Smoke and flame appear at the surface, on a row of whole tyres, at the shredder, by the fence or in a skip of rejects, often at night. A camera watching the yard sees all of these at once.
  • People who should not be there are the start of an arson attack. Fence and gate alerts after closing give you a chance to act before anything is lit.
Layers, not a single deviceStorage limits and separationpile size, 6m gaps, first in, first outTemperature probes for shredheat inside deep or long-stored pilesCamera smoke and flame detectionevery row, bay and shredder, day and nightSecurity and response planfence alerts, keyholders, plant, waterWoodcock AI provides the camera layer and its alerts; it works alongside the othersFour layers
How storage rules, probes, cameras and the response plan fit together in a tyre site FPP.

Indoor shredding halls need the same thinking. The EA requires suppression as well as detection when waste is stored in a building, and the detection still has to raise the alarm when the building is empty.

How do you catch a fire after the site has closed?

Most tyre yards are busy in the day and empty at night. A fire watch at close-down covers the period straight after the shredder stops. For the rest of the night, you need something that keeps watching and tells a person straight away, and something that warns you when someone climbs the fence.

Dusk CCTV of a palisade fence and locked gate at a tyre yard, with a teal virtual line running along the post topsFence at dusk
A virtual line along the tops of the posts raises an alert when someone crosses it after the gate is locked.

With camera detection, each row of tyres, each bale block, the shredder and the quarantine area can be its own detection zone. When smoke or flame appears in a zone, the alert goes to the duty keyholder’s phone with a short clip, so they can see what is happening before they set off. Email alerts go to the wider duty list, and an alarm receiving centre (ARC) or call alerts can be added for sites where nobody is on call overnight. Our out-of-hours site security checklist covers the security side of a closed site.

How quickly do you need to respond?

The EA guidance requires a quarantine area that can hold at least 50% of the volume of your largest pile, with 6 metres of separation around it, and says you must be able to move waste into it as soon as possible or, at most, within 1 hour of a fire starting. That hour only starts to work for you if somebody knows about the fire. Detection that only works while staff are on site is not enough for a yard that is empty all night.

From first smoke to a contained fireDetectsmoke in a zoneAlertapp + clip, emailCheckkeyholder views clipSeparatepull unburnt tyres awayQuarantinewithin 1 hourOptional: alarm receiving centre (ARC)for sites where no keyholder is on callEA FPP guidance: waste must reach the quarantine area as soon as possible, at most within 1 hourFirst smoke to contained
The path from an alert to unburnt tyres pulled clear and waste moved to quarantine.

Write the response into the plan with names, roles and travel times: who receives the alert, who goes to site, how they get in, which plant they use to pull tyres away from the fire, where the quarantine area is, and how firewater will be contained. The EA asks for water supplies that can deliver what is needed to fight a fire, and for details of the firefighting resources you have on site, day and night. Our FPP detection template helps you set this out. If your site is in Wales, see our guide to NRW fire prevention plan detection.

Where does Woodcock AI fit at a tyre site?

Woodcock AI turns the CCTV you already have into AI smoke and fire detection. It connects to your existing cameras or recorder over ONVIF or RTSP, so the cameras that already overlook your rows, bales and shredder can start watching for smoke and flame without being replaced.

  • Polygon detection areas. Draw a shape that follows the edge of each row, bale block, shred pile or quarantine bay, so every alert names the area on your FPP site plan. See polygon detection zones.
  • Self-learning, fitted to each scene. Each camera’s model is fitted to its own view and learns from that site’s normal footage, which matters in a yard full of dark rubber, floodlight glare, rain and moving plant. Read about our self-learning AI.
  • Years of development, in use today. Woodcock AI has been developed over several years and runs on real UK waste and industrial sites.
  • Alerts that reach a keyholder. App alerts with a clip and email as standard, with an alarm receiving centre (ARC) and call alerts as optional add-ons. Per-camera schedules keep smoke and fire detection on around the clock, with intrusion or line-crossing alerts on the fence once the site is closed.
  • Records for your plan. Each alert keeps its time, area and clip, and we run smoke tests on site at commissioning so you have evidence that the system works on your cameras.

Camera detection does not replace temperature monitoring of shred and crumb piles, and it does not replace a life-safety fire alarm or the suppression a building needs. It adds a layer that watches the whole yard, all night, and tells someone straight away. For how it works in detail, see our AI smoke and fire detection camera page and our guide to video smoke detection on existing CCTV. For other waste sites, see AI CCTV for waste and recycling, wood recycling yards and waste transfer stations.

Which sources is this page based on?

We have summarised these documents in our own words. Always read the current versions and follow your permit. This page is general guidance, not legal or regulatory advice; your regulator decides what is acceptable for your site.

Running a tyre recycling or tyre storage site?

Book a site assessment and we will look at your cameras, the rows, bales and piles your plan covers, and how alerts should reach your keyholders. Or ask for a live test on your cameras first: we connect two or three of them for about a fortnight.

Frequently asked questions

Is CCTV acceptable fire detection for a tyre site FPP?

It can be part of it. The EA fire prevention plan guidance lists CCTV visual flame detection systems among appropriate automated systems. Your plan must show the system suits your site, raises the alarm when the site is closed and meets the certification wording, so check with your regulator.

What is the maximum pile size for tyres?

Under the EA standard measures, 450 cubic metres for loose whole tyres, and 300 cubic metres for baled tyres, shred between 30 and 150mm, and crumb under 30mm. All piles must be no higher than 4 metres and no longer or wider than 20 metres.

How far apart should tyre piles be?

At least 6 metres from each other and from the site boundary, buildings and other combustible materials, unless a suitable fire wall is used. The EA notes that higher-calorific waste such as tyres may need greater distances.

When does the T8 exemption end?

GOV.UK says T8 will be withdrawn in England on 6 April 2027, subject to Parliament, as part of reforms expected to come into force from 6 January 2027. Apply for an environmental permit before T8 ends; you can keep operating while the application is processed.

Can a camera detect self-heating inside tyre shred?

No. Heat deep inside a pile is not visible to an ordinary camera, which is why the HSE recommends sub-surface temperature monitoring. A camera sees smoke and flame once they reach the surface, and watches every pile and the shredder at once, day and night.

Why not just spray water on a tyre fire?

The HSE says that once a fire in tyre shred or crumb is established, water or foam applied in situ is generally ineffective and can create oily run-off. Its first priority is separating unburned material, which is easier the earlier the fire is found.

Does Woodcock AI need new cameras?

Usually not. Woodcock AI connects to existing cameras or recorders over ONVIF or RTSP. At a site assessment we check whether your current views cover the rows, piles, shredder and quarantine area in your plan, and suggest extra cameras only where there are gaps.

Last reviewed 30 October 2026

Book a free site assessment